Cohabs – London
100+ bedrooms, 10+ homes. One standard, every time.
When Muchmore Design creates a home for Cohabs, it isn’t just a building to furnish — it’s somewhere people will live, work and build a community from day one. Every room has to feel finished, considered and ready the moment a resident walks through the door. Our job is to make sure that happens, on time, every time.
Muchmore Design appointed 3PL Interiors to manage the FF&E logistics behind their Cohabs projects — an ongoing partnership spanning 11 co-living homes across London. From the first supplier delivery to the final bedside lamp switched on, we own the journey in between.
Our scope covers everything: acting as the delivery contact for every supplier order, receiving, inspecting and logging each item into our online portal, secure storage, scheduled delivery to site, and full installation. Across each home that means everything from fully furnished bedrooms — mattresses, rugs, lighting and soft furnishings — through to communal kitchens, lounges and dining areas.
Co-living leaves no room for slippage: residents have move-in dates, and every room has to be ready before they arrive. Our team works floor by floor, room by room, completing installs on time – every time. Because we handle the suppliers, the tracking and the sequencing, the Muchmore team can stay focused on design — not chasing deliveries.
Every item tracked from intake to install. Every room handed over ready to live in.
“1,000+ pieces of furniture. 10+ homes. 100+ rooms. One trusted logistics partner.”
This is what FF&E logistics looks like when it becomes part of the process — not a one-off delivery, but a partnership that makes every new home feel effortless.


Co Space – St Albans
28,000 sq ft. Five floors. Zero room for error.
When Tiffany Thomas of Waistcoat & Badger designed Co-Space St Albans, she envisioned a workspace that would feel as considered and refined as the people working within it. Our job was to make sure every piece arrived in perfect condition, was tracked meticulously, and landed exactly where it needed to be — before a single desk was sat at.
Waistcoat & Badger appointed 3PL Interiors to manage the complete FF&E logistics operation for Co-Space St Albans — a landmark 28,000 sq ft commercial fit-out spanning five floors. From the moment the first delivery arrived at our warehouse, through to the last sofa settling into place, we owned the entire journey.
Our scope covered everything: receiving, inspecting and logging every item into our online portal, secure storage, coordinated delivery to site, and full installation — across a project that ran from bespoke meeting tables, luxurious sofas and feature lighting, right through to over 400 office chairs, desks and pedestals.
A dedicated team of trained installers worked methodically across the five-floor site, completing the full installation in just two weeks. With a project of this scale, sequencing is everything — and our team’s experience meant Tiffany and the Co-Space team could focus on the finishing touches, not the logistics.
Every item was tracked from intake to install. Every floor was handed over clean.
“400+ pieces of office furniture. 5 floors. 2 weeks. One seamless install.”
This is what FF&E logistics looks like when it’s done properly — not just delivered, but held carefully, and handed over beautifully.